跳至主要內容
頂端

Patty J February 2022 Projects

, WIDOWS MITE

Install Shower grab bar, replaster area beneath floor heaters in LR and BR, paint fireplace and basement stairs, clean bathroom floor tiles (both bathrooms), hang picture, repair cracks and small holes in walls throughout the house, replace 20 light switches in the house, repair/replace as needed weather stripping on garage door and caulk basement windows. Total expenses $280.

配對捐款
捐款運作
點擊任何「立即捐款」按鈕,然後決定您的捐款金額。您會被導向至您選擇的付款處理器。您的捐款一經處理,即會送交您選擇的慈善機構。

需要協助嗎?
查看常見問題清單或聯絡支援