跳到主要内容
顶部

Patty J February 2022 Projects

来自 WIDOWS MITE

Install Shower grab bar, replaster area beneath floor heaters in LR and BR, paint fireplace and basement stairs, clean bathroom floor tiles (both bathrooms), hang picture, repair cracks and small holes in walls throughout the house, replace 20 light switches in the house, repair/replace as needed weather stripping on garage door and caulk basement windows. Total expenses $280.

匹配服务
捐款的运作方式
点按“立即捐款”按钮,然后决定您的捐款金额。然后,您将来到选择付款处理方页面。我们处理完您的捐款后,会将其发送给您选择的慈善机构。

需要帮助?