Building Interior Renovation

von COASTSIDE POST 474 THE AMERICAN LEGION DEPARTMENT OF CALIFORNIA

The flooring behind bar, under beer & keg coolers & the plywood platform beneath the sinks, ice bins & dish washer are collapsing due to water & termite damage. A total estimate for repairs is unknown until the extent of damage can be assessed. This requires time and money for initial tear down estimated between $5k-$10k. Best guess for time to completion is roughly 5-10 days.
The ideal solution is to repair the sub-floor as needed & pour a slab of water resistant epoxy with integrated floor drains and an elevated slab for the triple sink, ice bins and dishwasher also with integrated drainage for efficient & easy cleaning.
We recently purchased a larger new commercial dishwasher so the added weight of the machine from its size, additional glassware & water capacity has compromised the stability of the floor beneath it. We will also have the bar refinished while it is disassembled for the floor repairs. We have a member that owns a local furniture restoration business, he has already restored several of our outdoor tables & done a beautiful job. He would like to restore and refinish the bar top and front. While everything is under construction the bar will have to remain closed during which time a thorough inventory & reorganization of entire main building, office, sheds and containers will take place, as well as deep cleaning & sanitizing by members & volunteers.

Aufstockungsangebot
Wie Spenden funktionieren
Klicke auf die Schaltfläche „Jetzt spenden“, und lege dann deinen Spendenbetrag fest. Anschließend wirst du an den Zahlungsdienstleister deiner Wahl weitergeleitet. Sobald deine Spende bearbeitet wurde, wird sie an den Wohltätigkeitsverband deiner Wahl weitergeleitet.

Brauchst du Hilfe?